Important information on stand construction
1. Assembly and Dismantling
Assembly around-the-clock:
Sun 12 February 2012 from 7 a.m. until Tue 14 February 2012 7 p.m.
Exhibition stands for which assembly has not commenced by 3 p.m. on Tuesday, 14 February 2012, will be decorated by the organizer, if they cannot be otherwise disposed of. Costs incurred will be charged to the exhibitor.
Dismantling:
Sat 18 February 2012 5 p.m. - midnight
Sun 19 February 2012 midnight - 10 p.m.
Mon 20 February 2012 7 a.m. - 7 p.m.
Access to the halls during assembly and dismantling times is only permitted on display of special passes, which are not valid during the exhibition. Dismantling is not permitted before 5 p.m. Please see item 19 of the Special Conditions for Participation.
Sun 12 February 2012 from 7 a.m. until Tue 14 February 2012 7 p.m.
Exhibition stands for which assembly has not commenced by 3 p.m. on Tuesday, 14 February 2012, will be decorated by the organizer, if they cannot be otherwise disposed of. Costs incurred will be charged to the exhibitor.
Dismantling:
Sat 18 February 2012 5 p.m. - midnight
Sun 19 February 2012 midnight - 10 p.m.
Mon 20 February 2012 7 a.m. - 7 p.m.
Access to the halls during assembly and dismantling times is only permitted on display of special passes, which are not valid during the exhibition. Dismantling is not permitted before 5 p.m. Please see item 19 of the Special Conditions for Participation.
2. Important information and instructions
| Important information on event/General Terms of Contract for the Exhibitors Info Manual | ||
Info 1 and 2 | ||
| Information from A-Z | ||
Info 3 | ||
| Technical Regulations | ||
Info 4 Instruction sheet “Technical data for halls“ Instruction sheet
“Instructions on installing sprinklercompatible
ceiling fabrics“ Instruction sheet“Special exemption from ban on use
of trucks on Sundays“ Instruction Sheet
“Fire prevention – European classification of building products“ Instruction Sheet “Pyrotechnics/actions
involving fire hazards” Instruction Sheet
“Use of fog machines 1” Instruction Sheet “Fire extinguishers” Information sheet
“Glass and acrylic glass“ Instruction Sheet
“Suspension points, trusses and lifting equipment” Instruction Sheet “Laser systems” Instruction Sheet “X-ray equipment” | ||
| German Freight Forwarders’ Standard Terms and Conditions (ADSp) | ||
Info 5 | ||
| Your partners in the Exhibition Center Nuremberg | ||
Info 6 | ||
3. Delivery
Please note: Access to loading yards only with possession of a temporary permit, deposit EUR 100.00. You will find the validity for your stay on the temporary permit. The deposit fee is retained if the limit is exceeded.
4. Bavarian Venue Regulations
All events in the Exhibition Centre Nuremberg are strictly governed by the Bavarian Venue Regulations; a full version of the regulations is available at:
http://www.bayerisches-innenministerium.de/bauen/baurecht/vorschriften/
http://www.bayerisches-innenministerium.de/bauen/baurecht/vorschriften/
Links & tips
ExhibitionService
Are you interested in our range of services? The exhibition services team will help you!
Contact details













